
About Us
Wastewater treatment equipment,
engineered for compliance
Guanke focuses on R&D and manufacturing of wastewater treatment equipment, offering one-stop solutions for domestic sewage, hospital wastewater, food processing, textile dyeing and rural living environments.
800+
Projects Delivered
Projects spanning healthcare, food, textile dyeing, chemicals and rural living environments.
15+
Years of Experience
Fifteen years of equipment manufacturing and project delivery experience, with a stable process and commissioning team.
4.9/5
Client Satisfaction
Delivered to the contracted targets, stable online effluent data, and a high rate of repeat and referral business.
Products
Six core product lines,
covering every stage
Covering pre-treatment, biological treatment, solid-liquid separation and advanced treatment, we combine processes to suit your water quality and site — equipment and engineering delivered as one package.

Integrated Wastewater Treatment Unit
Containerised and buried integrated units with a small footprint and fast installation, suited to domestic sewage, hospital wastewater, scenic areas and decentralised rural treatment.

MBR Membrane Bioreactor
The MBR process delivers stable effluent that can be reused for irrigation and flushing — ideal for strict discharge limits and space-tight sites.

Dissolved Air Flotation Unit
Efficiently removes suspended solids, oils and colloids; widely used for pre-treatment and polishing of food, slaughterhouse, paper and dyeing wastewater.

Screw Press Sludge Dewatering Machine
Low-energy continuous operation with no clogging or sludge loss; low cake moisture significantly cuts sludge haulage and disposal costs.

Rotary Bar Screen
Automatically intercepts and removes floating and suspended debris, protecting downstream pumps and equipment, with stable operation and simple maintenance.

Industrial Wastewater Treatment System
Customised process trains and equipment for textile dyeing, chemicals, electroplating and pharmaceuticals, achieving reliable compliance or water reuse.
Our Process
Five steps to compliant operation
A process engineer follows every project end to end — water analysis, selection and design, manufacturing, on-site installation and commissioning to target. What we hand over is not just equipment, but a scheme that runs for years.
01
Needs Assessment
Tell us your water quality, flow rate and discharge requirements; our engineers help define the process route and equipment configuration.
02
Site Survey
We inspect the site and existing facilities, take samples where needed, and confirm treatment capacity and layout.
03
Process Design
We issue the process flow diagram, equipment list and quotation, fixing effluent targets, lead time and acceptance criteria.
04
Manufacturing & Installation
Equipment is built in our own workshop; our crew handles erection, piping and electrical commissioning on site.
05
Acceptance & O&M
Handover follows stable compliance, with operator training, spare parts and scheduled inspection and maintenance.
Projects
800+ projects,
tailored to every site
Projects across hospitals, food processing, textile dyeing, rural communities and scenic areas — all running in stable compliance with controlled operating and maintenance costs.
A Hospital in Weifang
Hospital wastewater treatment station
A Food Processing Company
Food wastewater treatment project
A Rural Village Improvement Project
Rural domestic sewage treatment
A Textile Dyeing Mill
Wastewater upgrade and retrofit project
A Scenic Resort Town
Scenic-area wastewater treatment station
Client Feedback
Real feedback from our clients
Client feedback is the most direct basis for improving our process and service. You are welcome to call and talk through your project.

Verified Client
Everything from proposal to commissioning went smoothly. The engineers explained the process and operating points clearly, the equipment arrived and started up on schedule, effluent targets are stable, and follow-up support is fast.

A Food Processing Company
Wastewater project · Weifang, Shandong

Verified Client
Our plant had very little space. Guanke laid out a compact solution for the site; the integrated unit needs little room and commissions quickly. More than a year without clogging or sludge loss has taken a lot of pressure off our O&M team.

Logistics Department, a hospital
Hospital wastewater project · Shandong

Verified Client
Dyeing wastewater fluctuates a lot and we worried about stable compliance. Guanke combined DAF with biological treatment and trained our operators; it now runs steadily and online effluent data has stayed within limits.

A Textile Dyeing Mill
Upgrade project · Shandong
News
Wastewater technology insights
-

/
Putting an Integrated Wastewater Unit into Service: What to Check at Every Stage
From delivery to first compliant discharge, an integrated unit depends on a handful…
2–3 minutesread
-

/
When Is an MBR Membrane Bioreactor Worth Choosing?
MBR delivers excellent effluent and a small footprint — at a price. Four…
1–2 minutesread
-

/
Domestic Sewage vs Industrial Wastewater: Where the Treatment Logic Differs
The same tank, the same blower, a completely different design logic. What changes…
1–2 minutesread
FAQ
What You May Want to Know
Still have questions? Call us at 13081695372.
Our main products are integrated wastewater treatment units, MBR membrane bioreactors, dissolved air flotation units, screw press sludge dewatering machines, rotary bar screens and complete industrial wastewater treatment systems. We also provide process design, installation, commissioning and O&M.
It depends on flow rate, water quality, discharge standard and site conditions. Domestic sewage usually uses an integrated unit with MBR, food and slaughterhouse wastewater normally needs DAF pre-treatment, and industrial wastewater gets a process train tailored to the sector. Send us your water data for free selection advice.
Price depends on capacity, effluent standard, material (carbon steel or stainless steel) and configuration. Small integrated units start in the tens of thousands of RMB; complete industrial projects range into the hundreds of thousands. Share your flow rate, water quality and site and we will quote item by item — never a vague lump sum.
Standard integrated units take 7–15 days to build and 3–7 days to install and commission on site. Complete industrial projects take roughly 30–60 days depending on process complexity. The schedule is written into the contract.
Depending on the process, effluent reliably meets Grade 1A/1B of China’s discharge standard for municipal wastewater plants, or local and industry-specific standards. Where reuse is required, MBR with advanced treatment delivers water for irrigation, flushing or production reuse.
The units are highly automated — routine inspection and periodic cleaning are enough. We provide operator training, spare parts and remote or on-site maintenance, and keep common wear parts in stock all year.
Most welcome. Several commissioned projects in and around Weifang can be visited on site, and we can also show you live operating data online. Please call ahead to book a factory visit.
The complete unit carries a one-year warranty, with a longer term on the main structure; non-human damage is repaired free of charge. Response time is 24–48 hours inside Shandong and within 48 hours elsewhere, by engineer visit or remote support.

